The Project
When you think of designing a world-class music centre for the arts, excellent acoustics and soundproofing may come to mind. With its smart design, the 1,400-seat Green Music Center at Sonoma State University more than meets those concert design requirements. But perhaps surprisingly, one of the most innovative aspects of the concert hall wasn’t its soundproofing, but its waterproofing system.
For all participants involved in this project, finding a successful solution to this unusual waterproofing challenge was music to their ears.
The Green Music Center concert hall entrance sits at ground level, and the hall slopes downward, below grade, toward the stage. In addition, several feet of space required for the building’s air supply below the floor extends the depth even farther.
With a high water table just a few feet below the surface, some clever concert design and construction was needed—to create both a temporary underground dewatering system during construction and a long-term waterproofing solution to keep the concert hall and cultural exhibition dry for years to come.
“We knew that the water table would create a real challenge, so temporary wells were created around the perimeter foundation that collect water for pumping during construction”, explained Bill Bussey of A.C. Martin Partners, the architects for the concert hall.
During construction, with the high water table, water pumps were moving thousands of gallons of water per day and operating constantly. With energy and noise concerns, it became apparent that a more efficient long-term solution was needed. As a result, a sub-surface diversion system for the groundwater was created around the perimeter of the entire building.
In addition to the dewatering system, waterproofing was essential to the success of the concert design project.
With the guidance of their specialised waterproofing consultants, A.C. Martin Partners specified our GCP waterproofing products, based on the architectural firm’s long-term track record using them in these types of projects.
Blue360sm Product Performance Advantage: Because every project, large or small, deserves the best level of protection.
The Results
PREPRUFE® 300R was used in the sump pit, where despite muddy conditions, the pre-applied waterproofing membrane’s aggressive pressure-sensitive adhesive formed a tight adhesive bond to the concrete to prevent ingress or migration of water around the structure. To waterproof the exterior basement walls, BITUTHENE® System 4000 was applied. As a pre-formed waterproofing membrane, BITUTHENE® System 4000 incorporates a super tacky self-adhesive membrane with a latex surface primer to provide a long-term waterproofing solution
“We’re pleased with the overall solution”, said Bill Bussey. “The basement is dry with no complaints”.
To isolate the concert hall from any noise created by the water pumps, the facility is completely sound-insulated to ensure the finest acoustics. And now, the entire hall is waterproofed just as effectively thanks to the unique concert design.
gcpat.in | India customer service: +91 124 4885900
GCP Applied Technologies Inc., 2325 Lakeview Parkway, Alpharetta, GA 30009, USA
GCP Applied Technologies India Private Limited, Unit No. 208, Second Floor, Time Tower Building, Sector-28, MG Road, Gurugram, Haryana-122002, India
This document is only current as of the last updated date stated below and is valid only for use in India. It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use. Additional literature such as Contractor Manuals, Technical Bulletins, Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.in. Information found on other websites must not be relied upon, as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content. If there are any conflicts or if you need more information, please contact GCP Customer Service.
Last Updated: 2023-07-25
https://gcpat.in/en-gb/about/project-profiles/arts-facility-use-gcp-complete-concert-design